Planning
Define the design event, flows, discharge, ground, utilities and construction phases.
Infrastructure projects need traceable assumptions, interfaces, responsibilities and acceptance criteria.
AQUATEX provides a project-review route; design and authority approval remain with the appointed professionals and authorities.
Define the design event, flows, discharge, ground, utilities and construction phases.
Prepare scope, evidence, inspection criteria and commissioning deliverables.
Record access, cleaning, inspection, ownership and handover information.
Roads, public realm and municipal developments need a drainage strategy that connects runoff collection, temporary storage, controlled release and safe exceedance. An underground modular system is one component of that strategy, not a substitute for project-specific hydraulic design.
The project team should define catchment areas, design rainfall, allowable discharge, receiving system constraints and the route taken when the design event is exceeded. These inputs establish the required hydraulic duty before the tank footprint and connections are developed.
Underground infrastructure competes for space with utilities, road construction, landscaping and foundations. Cover, access, loading, inspection points and construction phases should therefore be reviewed as part of the coordinated design rather than left to installation.
The design brief should identify pretreatment, inspection access, maintenance responsibilities and the information required at handover. This gives the operator a clear basis for future checks and helps the delivery team compare the installed arrangement with the approved design.
Storage may be considered when runoff must be managed within the site and released according to the project drainage strategy. The required duty must be established by the responsible design team.
Loading, cover, utilities, access, inlet and outlet levels, inspection, construction sequence and future maintenance all need coordinated review.
Provide the site and catchment information, hydraulic criteria, available levels, ground conditions, loading, utility constraints, access requirements and intended maintenance approach.