DOCUMENT CONTROL · UAE

Explore technical documents and resources.

Catalogues, drawings, guides and technical answers organised by product and application.

Documents

These product information packs describe construction, functions, interfaces and source reference data. They are not certificates or approved installation instructions.

AquaBox — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

BlockTech — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

Documentation is part of the system.

The library brings together material for product selection, design coordination, installation and operation.

Request the applicable submittal package with the market, product, duty and project stage.

Review points

Revision

Check document code, revision, date and product before use.

Applicability

Confirm that the document matches the market and design condition.

Support

Send the project configuration to receive the applicable documents.

Choose a product document

Browse product information packs in five languages, including construction, functions, interfaces and reference tables. Download the editable project questionnaire separately.

Choose a product document

Each pack combines the product overview, technical reference information, component and interface description, configuration comparison and installation/operation planning notes. The CSV is a blank questionnaire for your project, not a product datasheet.

Use the right revision

Check the product, language, version, date and applicability before use. Request project-specific installation details and evidence for any design rating. An information pack is not an approval or certificate.

1. Hydraulic function and site conditions

Record the intended duty, catchment or water source, available design flows and volumes, inlet and outlet levels, discharge condition and exceedance route. Add ground investigation, groundwater, available footprint, burial constraints and known utilities where relevant.

2. Loading, access and construction interfaces

Identify the intended surface use, traffic and other loading, cover, adjacent foundations, construction access and sequence. Note the proposed inspection points, pretreatment interfaces and access needed for operation and maintenance after handover.

3. Document control and project stage

State whether the request supports concept review, coordination, tender, construction or handover. For every document received, check its product, market, revision and date. Project-specific design and approval remain with the appointed professionals and relevant authorities.

Blank project brief, revision 2026-10-07. Record values, units, sources and open items; this worksheet contains no product specifications.

Download the editable project-input worksheet (CSV)

Using the project checklist

Must every item be available before contacting AQUATEX?

No. Send what is available and identify assumptions or open items. The review can then state which additional inputs are needed.

Does a catalogue define the final configuration?

No. A catalogue describes a product route. The project configuration depends on the recorded duty, site conditions, interfaces and responsible design decisions.

How should document revisions be controlled?

Record the document code, revision, date, product and market, and replace superseded copies in the project information system according to the project's document-control process.

Using these documents

Check the product, language and version shown on each card. The CSV is an editable project questionnaire. The offer identifies the selected configuration, included equipment and applicable documents.