DOCUMENT CONTROL · KENYA

Explore technical documents and project inputs.

Use current product documents and record the market, duty and project stage when requesting support.

Documents

These product information packs describe construction, functions, interfaces and source reference data. They are not certificates or approved installation instructions.

AquaBox — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

BlockTech — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

Documentation is part of the system.

The library supports product selection, coordination, installation and operation.

Confirm applicability and revision before using a document.

Review points

Revision

Check document code, revision, date and product.

Applicability

Confirm the market and design condition.

Support

Send the project configuration for the applicable package.

Choose a product document

Browse product information packs in five languages, including construction, functions, interfaces and reference tables. Download the editable project questionnaire separately.

Choose a product document

Each pack combines the product overview, technical reference information, component and interface description, configuration comparison and installation/operation planning notes. The CSV is a blank questionnaire for your project, not a product datasheet.

Use the right revision

Check the product, language, version, date and applicability before use. Request project-specific installation details and evidence for any design rating. An information pack is not an approval or certificate.

Map the source, use and review responsibilities

Record the county, site, roof or paved catchment, any other water source, intended use and receiving drain or ground. Identify the appointed drainage designer, county or other receiving-system authority and any water-resource review relevant to the actual works. The WRA permitting information is a starting point for checking applicable water-resource activities with the authority; it is not evidence that every tank has the same permit requirement.

Prepare a time-based storage and reuse brief

For reuse, include the available rainfall or inflow record, contributing area, collection losses, demand profile, overflow and make-up-water approach. State what happens during supply interruptions or changing demand. Keep the water-quality assessment and treatment objective tied to the intended use, with the available test results and operating responsibilities.

Coordinate maintenance and continuity of operation

Document how inspection, sediment removal and access to pumps or controls will work at the actual site. Record power and control interfaces where pumping is proposed, the route for overflow and who will keep operational records. Provide the county or asset-owner requirements alongside the selected product instructions at handover.

Blank project brief, revision 2026-10-07. Record values, units, sources and open items; this worksheet contains no product specifications.

Download the editable project-input worksheet (CSV)

Public references for the project location

Using these documents

Check the product, language and version shown on each card. The CSV is an editable project questionnaire. The offer identifies the selected configuration, included equipment and applicable documents.