US PROJECT PLANNING

Stormwater design resources

Prepare the inputs needed for project-specific review

Documents

These product information packs describe construction, functions, interfaces and source reference data. They are not certificates or approved installation instructions.

AquaBox — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

BlockTech — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02
US project references and planning guides

Planning the project

Use these resources to organize project evidence, not to replace calculations or authority review. A traceable input package reduces rework and makes assumptions visible to the engineer, owner and supplier.

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Evidence to prepare

Hydrology

Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.

Site

Provide survey, utilities, ground conditions, groundwater, flood context, access, loading and construction constraints.

Governance

Identify the owner, engineer, approving authority, applicable criteria, inspection route and maintenance responsibility.

Review sequence

  1. Confirm the project objective and controlling criteria.
  2. Collect traceable site and water data.
  3. Compare feasible layouts and interfaces.
  4. Record assumptions requiring engineer or authority confirmation.
  5. Complete project-specific design, approvals and maintenance planning.

Questions the project team should close

  • Which published rainfall source and design events control the analysis?
  • What inflow, storage, release, infiltration or reuse performance is required?
  • What do survey, utility, geotechnical, groundwater and flood records show?
  • Which temporary and permanent loads and construction stages require verification?
  • How will pretreatment, inspection, sediment removal and component access work safely?
  • Who owns operation, record keeping and maintenance after handover?
  • Which assumptions require confirmation by the engineer, owner or approving authority?

Resolve conflicts before procurement. If information is unavailable, record the gap rather than replacing it with a generic assumption.

Primary public references

Use the current agency material and the requirements adopted for the project location.

Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.

Choose a product document

Browse product information packs in five languages, including construction, functions, interfaces and reference tables. Download the editable project questionnaire separately.

Choose a product document

Each pack combines the product overview, technical reference information, component and interface description, configuration comparison and installation/operation planning notes. The CSV is a blank questionnaire for your project, not a product datasheet.

Use the right revision

Check the product, language, version, date and applicability before use. Request project-specific installation details and evidence for any design rating. An information pack is not an approval or certificate.

Blank project brief, revision 2026-10-07. Record values, units, sources and open items; this worksheet contains no product specifications.

Download the editable project-input worksheet (CSV)

Public references for the project location

Using these documents

Check the product, language and version shown on each card. The CSV is an editable project questionnaire. The offer identifies the selected configuration, included equipment and applicable documents.