Hydrology
Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.
Site type changes the constraints, not the need for evidence. Use the application routes to capture traffic, public access, construction phasing, pollutant sources, utility congestion, inspection ownership and the applicable permitting path.
A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.
Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.
Provide survey, utilities, ground conditions, groundwater, flood context, access, loading and construction constraints.
Identify the owner, engineer, approving authority, applicable criteria, inspection route and maintenance responsibility.
Resolve conflicts before procurement. If information is unavailable, record the gap rather than replacing it with a generic assumption.
Use the current agency material and the requirements adopted for the project location.
Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.