Frequently asked questions
Planning the project
Early answers depend on the project evidence: location, drainage criteria, rainfall basis, ground conditions, groundwater, loads, outlet or reuse objective and maintenance ownership. A form submission starts review; it is not approval, certification or a final design.
Which product should I discuss for my project?
Start with the water-management duty. AquaBox is the product route for underground storage with treatment or pumping interfaces where those functions are included in the project. BlockTech is the route for modular stormwater detention, retention or infiltration configurations. Share the intended destination of the water so the discussion follows the system's required function.
What can I send before the design is complete?
Provide location, project stage, intended duty, available drawings and the operating or drainage inputs already established. Include known ground, groundwater, loading and utility constraints. Identify pending investigations and decisions separately. The project inquiry can start from available information while keeping unresolved design inputs visible.
How should I compare project quotations?
Ask each proposal to identify configuration, components, interfaces, exclusions and delivery basis. Distinguish product supply, transport, auxiliary equipment and civil works. Use the same project inputs and requested scope for the comparison. Confirm which documents are needed before the next procurement decision.
Which technical documents should I request?
Ask for the current documents applicable to the proposed product version and configuration, including connections, installation and maintenance. Identify any project-specific drawings or calculations the engineer still needs to prepare. Retain document revisions with the selected arrangement. The resources hub provides guides for assembling a traceable input package.
How do I prepare for inspection and maintenance?
Identify the asset owner, inspection locations, access and the proposed sediment-management method. Include auxiliary equipment and inlet and outlet controls in the operating plan where applicable. Agree records, inspection triggers and responsibilities with the project team. Keep the installed layout and equipment manuals available to the operator.
Project design and review
A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.
Related US guidance
Primary public references
Use the current agency material and the requirements adopted for the project location.
Related project guidance
Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.