US PROJECT PLANNING

Rainwater reuse design

Connect storage volume to demand and water-quality objectives

Planning the project

Build a water balance using a documented rainfall record, catchment assumptions, losses, demand profile, overflow and make-up water. Define water-quality, treatment, signage and cross-connection controls with the responsible authorities.

Link the rainfall record to demand

Use a time-based water balance that records catchment inflow, collection losses, available storage, demand, make-up supply and overflow. Retain the rainfall source and period, demand assumptions and the selected time step. A single design-storm volume does not describe supply for a changing reuse demand.

Separate quantity from water quality

Identify the intended non-potable use and define its quality, treatment and cross-connection requirements with the responsible specialists and authority. Describe the collected water and proposed treatment interfaces. Holding water in a tank does not establish suitability for an intended use.

Review the operating response

Record what happens during low supply, interrupted pumping, changing demand and high inflow. Identify controls, overflow, make-up-water interfaces and maintenance responsibilities. Ask for the selected configuration's applicable documents once the operating brief is established.

Project design and review

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Primary public references

Use the current agency material and the requirements adopted for the project location.