US PROJECT PLANNING

About AQUATEX

A project-led modular water infrastructure platform

Planning the project

AQUATEX uses a project-review workflow: establish the water-management objective, collect site evidence, identify interfaces and record decisions requiring the engineer or authority. Product selection follows that review; this page does not state US certification, local manufacture, stock or regulatory approval.

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Evidence to prepare

Hydrology

Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.

Site

Provide survey, utilities, ground conditions, groundwater, flood context, access, loading and construction constraints.

Governance

Identify the owner, engineer, approving authority, applicable criteria, inspection route and maintenance responsibility.

Review sequence

  1. Confirm the project objective and controlling criteria.
  2. Collect traceable site and water data.
  3. Compare feasible layouts and interfaces.
  4. Record assumptions requiring engineer or authority confirmation.
  5. Complete project-specific design, approvals and maintenance planning.

Questions the project team should close

  • Which published rainfall source and design events control the analysis?
  • What inflow, storage, release, infiltration or reuse performance is required?
  • What do survey, utility, geotechnical, groundwater and flood records show?
  • Which temporary and permanent loads and construction stages require verification?
  • How will pretreatment, inspection, sediment removal and component access work safely?
  • Who owns operation, record keeping and maintenance after handover?
  • Which assumptions require confirmation by the engineer, owner or approving authority?

Resolve conflicts before procurement. If information is unavailable, record the gap rather than replacing it with a generic assumption.

Related US guidance

Primary public references

Use the current agency material and the requirements adopted for the project location.