Hydrology
Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.
Choose a route by outcome rather than product name. Detention controls release timing; infiltration depends on subsurface suitability; reuse connects storage with demand and water-quality objectives; treatment and pumping address separate project constraints.
A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.
Document the rainfall source, drainage area, inflow method, operating levels, outlet or reuse objective and exceedance route.
Provide survey, utilities, ground conditions, groundwater, flood context, access, loading and construction constraints.
Identify the owner, engineer, approving authority, applicable criteria, inspection route and maintenance responsibility.
Resolve conflicts before procurement. If information is unavailable, record the gap rather than replacing it with a generic assumption.
Use the current agency material and the requirements adopted for the project location.
Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.