US PROJECT PLANNING

Stormwater treatment

Define treatment objectives from site and discharge requirements

Planning the project

Start with the pollutants and receiving condition identified for the site. Define pretreatment, treatment train, bypass, sediment access, sampling or inspection needs and the authority's water-quality requirements before selecting components.

Describe the source and receiving condition

Begin with the runoff sources, intended discharge or reuse destination and the quality objectives identified for the project. Record catchment activities and known sediment or other pollutant concerns. Share any available water-quality assessment with the team selecting the treatment train. The source and destination establish the task that treatment components must address.

Place storage within the treatment train

Coordinate inlet protection, pretreatment, storage, treatment equipment and the outlet as connected functions. When underground storage and equipment interfaces belong in the brief, use the AquaBox route to discuss that scope. Ask which components, controls and access provisions are included in the proposal. Treatment objectives and verification belong with the responsible specialists and the selected equipment documentation.

Make maintenance part of the comparison

Identify access to sediment collection, inspection points and equipment before procurement. Define the operating owner, observations to record and the response to blockage or equipment faults in the project plan. Share the applicable discharge or reuse criteria, available assessments and delivery destination with the inquiry. Request an explicit list of interfaces and information still needed for selection.

Project design and review

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.