Stormwater infiltration

Assess whether captured runoff can return to the ground

Planning the project

Infiltration screening should combine field-tested infiltration behavior with soil profile, groundwater, bedrock, setbacks, source-water risk and maintenance expectations. Maps are useful for planning, but the project team and authority determine the required investigation and acceptance criteria.

Establish whether the site supports infiltration

Infiltration sends suitable runoff into the surrounding ground. Begin with investigation at the proposed location, including field-test methods, soil profile, groundwater observations and known contamination concerns. Record nearby buildings, utilities and receiving waters for the responsible specialists to assess. A mapped soil category is a starting point for investigation; the design needs evidence for the actual footprint.

Coordinate the water path and pretreatment

Describe the contributing catchment, sources of sediment and other pollutants, proposed pretreatment and the route used when infiltration is limited. Provide the designer's storage requirement and levels together with the investigation report. Review a BlockTech infiltration arrangement only after the site's suitability and applicable acceptance criteria have been established. Keep access for pretreatment and inspection visible in the proposed layout.

Request a configuration with traceable inputs

Share the site-assessment record, available plans and the intended supply and construction scope. Ask which product interfaces, installation documents and maintenance provisions apply to the proposed arrangement. Identify the operator and the records required at handover. Where investigation remains incomplete, state the gap and retain a controlled-discharge option for the project team to assess.

Project design and review

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Primary public references

Use the current agency material and the requirements adopted for the project location.

Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.