US PROJECT PLANNING

Infiltration site assessment

Identify the site evidence needed before selecting infiltration

Planning the project

Record test locations and methods, soil horizons, seasonal groundwater, bedrock, contamination concerns, setbacks, pretreatment and observed variability. The approving authority determines required testing and design factors.

Map the investigation to the proposed footprint

Record field-test locations, depths and methods with the soil profile and the proposed infiltration area. Identify changes across the site and differences between the investigation level and planned base. A soil map helps plan investigation but does not replace field evidence for the selected location.

Close the groundwater and water-quality questions

Record seasonal groundwater, bedrock, nearby foundations and utilities, known contamination and the source of runoff. Identify pretreatment and the route for water when infiltration is limited. Obtain the authority's applicable criteria and the responsible engineer's interpretation before describing the site as suitable.

Retain evidence for operation

Keep the investigation report, selected design assumptions, inspection locations, sediment-management method and maintenance owner with the project records. Changes to catchment use or water quality may require a new assessment. Choose controlled-discharge storage when the site evidence does not support the infiltration route.

Project design and review

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Primary public references

Use the current agency material and the requirements adopted for the project location.

Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.