US PROJECT PLANNING

Installation, cover and loads

Record site loading and installation constraints for review

Planning the project

Provide grading, finished levels, pavement build-up, temporary and permanent loads, construction traffic, groundwater, excavation support, utilities, tolerances and inspection hold points. A qualified project engineer must confirm the structural and geotechnical design.

Coordinate temporary and permanent conditions

Provide proposed finished levels, pavement build-up, surface use, permanent traffic and temporary construction plant loads. Identify stockpiles and the sequence of backfilling and opening the surface to use. The permanent loading case does not automatically cover construction conditions.

Resolve the geotechnical and structural interfaces

Share the ground investigation, groundwater conditions, excavation support, adjacent foundations, utility constraints and available footprint. The appointed engineer must coordinate the applicable product instructions with the structural and geotechnical design for the selected arrangement.

Record inspection hold points

Agree the checks and records required before covered work becomes inaccessible. Retain current instructions, the approved layout, connection and access details and records of installation checks. Cover depths and load limits must come from the applicable reviewed product and project documents.

Project design and review

A preliminary concept is not a final drainage design. Confirm the controlling rainfall basis, allowable discharge, groundwater and flood context, geotechnical conditions, structural loads, construction access, maintenance route and applicable authority requirements for the specific site.

Primary public references

Use the current agency material and the requirements adopted for the project location.

Follow the project duty from site evidence to product review. Detention, infiltration and water reuse require different inputs.