DOCUMENT CONTROL · SOUTH AFRICA

Explore technical documents and project inputs.

Use current product documents and record the market, duty and project stage when requesting support.

Documents

These product information packs describe construction, functions, interfaces and source reference data. They are not certificates or approved installation instructions.

AquaBox — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

BlockTech — Product information pack

How it works · Technical information · Supply and interfaces · Installation and maintenance

Language
English
Version
1.1
Prepared
2026-11-02

Documentation is part of the system.

The library supports product selection, coordination, installation and operation.

Confirm applicability and revision before using a document.

Review points

Revision

Check document code, revision, date and product.

Applicability

Confirm the market and design condition.

Support

Send the project configuration for the applicable package.

Choose a product document

Browse product information packs in five languages, including construction, functions, interfaces and reference tables. Download the editable project questionnaire separately.

Choose a product document

Each pack combines the product overview, technical reference information, component and interface description, configuration comparison and installation/operation planning notes. The CSV is a blank questionnaire for your project, not a product datasheet.

Use the right revision

Check the product, language, version, date and applicability before use. Request project-specific installation details and evidence for any design rating. An information pack is not an approval or certificate.

Identify the municipal criteria and receiving asset

Record the municipality, site address, adopted stormwater criteria, drainage-report reference, existing connection point and the owner of the receiving asset. Include the allowable discharge decision, downstream constraints and surface exceedance route. Keep the current criteria with the design inputs rather than relying on a country-wide default.

Use local public material with its actual scope

Cape Town publishes information about its stormwater system and links its policy framework. Use this as a starting reference for projects within that municipality, and obtain the criteria from the relevant municipality elsewhere. The reference is context for project questions, not a product approval or a rule automatically applicable across South Africa.

Make the handover usable by the asset owner

Assign an asset identifier and record the installed layout, access locations, pretreatment, outlet control and inspection responsibilities. Identify which documents the municipal or private owner requires for adoption or handover. Separate product instructions, project calculations and municipal acceptance records so maintenance staff can trace the installed arrangement.

Blank project brief, revision 2026-10-07. Record values, units, sources and open items; this worksheet contains no product specifications.

Download the editable project-input worksheet (CSV)

Public references for the project location

Using these documents

Check the product, language and version shown on each card. The CSV is an editable project questionnaire. The offer identifies the selected configuration, included equipment and applicable documents.