Hydraulics
Record the catchment, design rainfall, available hydrograph or flows, storage volume, allowable discharge and exceedance route.
An attenuation tank temporarily receives runoff and releases it according to the hydraulic criteria established for the project. It must be coordinated with collection, pretreatment, discharge and the exceedance route.
The modular arrangement is reviewed after the responsible team records the site conditions, construction interfaces and inspection and operating requirements.
Record the catchment, design rainfall, available hydrograph or flows, storage volume, allowable discharge and exceedance route.
Resolve levels, ground, groundwater, cover, loading, utilities, access and construction sequence.
Define pretreatment, inspection, cleaning, ownership, records and handover information.
The commercial decision follows the hydraulic decision. Before requesting a tank configuration, the project team should establish why storage is needed, how runoff enters the system and how the stored water leaves it.
Provide the catchment definition, design event, inflow information, required storage and outlet criteria available from the drainage design. Include inlet and outlet levels and the route used when the selected event is exceeded. AQUATEX does not replace the responsible hydraulic designer.
Attenuation stores runoff for controlled release. Retention or reuse keeps water for a defined later duty. Infiltration returns suitable water to the ground and depends on verified soil, groundwater, water-quality and authority criteria. The terms should not be treated as interchangeable.
The proposed location must be checked against ground conditions, cover, traffic and other loading, utilities, foundations, access and construction sequence. Pretreatment, inspection and maintenance interfaces form part of the configuration and handover information.
The required storage comes from the project drainage assessment and its inflow, outlet and exceedance criteria. A product page cannot establish that volume for a site.
No. A modular system may be configured for different duties. Infiltration is appropriate only where the project evidence and applicable requirements support it.
Send the drainage criteria, available calculations or model outputs, levels, ground information, loading, constraints, access and maintenance approach.