Process
Map sources, uses, flows, target quality and integration points.
Assessment starts with water source and destination, potential contaminants, utilities and operating interfaces.
Product review does not replace project-specific safety, compatibility, hydraulic or approval work.
Map sources, uses, flows, target quality and integration points.
Record access, loading, utilities, ground conditions and construction constraints.
Plan inspection, controls, cleaning, maintenance and asset records.
Separate the site's water streams, intended uses and county receiving-system interfaces. An industrial reuse proposal needs an operating water balance and a defined quality objective.
Identify roof rainfall, paved-area runoff and process-related water separately. For each stream, state its quality evidence, intended destination and current handling arrangement. Trace any abstraction, discharge or other water-resource interface that the appointed team needs to discuss with WRA, together with the county drainage connection.
Describe the proposed technical use, changes in demand, available inflow record, collection losses, make-up-water approach and overflow route. Record treatment and pumping interfaces with controls, power and access. Storage capacity alone does not establish water-quality suitability or continuity of supply.
Map loading areas, utilities and access needed to keep the facility operating. Agree isolation, temporary drainage, maintenance access and inspection records for the installed arrangement. Keep product supply, civil works, treatment equipment and project-design responsibilities explicit in the request.